Quick answer
The project came online in 2012.[1] Turbine makers represented in the municipality: GE Wind (11 turbines).[1]
| Project | Online | Turbines in the municipality | Capacity in the municipality (MW) |
|---|---|---|---|
| Fire Island Project | 2012 | 11 | 17.6 |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the project in the municipality have been in place since 2012.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Anchorage Municipality, Alaska has one operating wind project with 11 turbines and 17.6 MW of recorded capacity in the municipality, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]
The project is Fire Island Project (2012, 17.6 MW).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
The project came online in 2012.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Alaska boroughs and census areas with wind projects include Kenai Peninsula Borough (1.5 MW), Denali Borough (24.6 MW), Kodiak Island Borough (9 MW), Aleutians East Borough (1 MW) and Northwest Arctic Borough (1.9 MW).[1]
Wind Royalties and Lease Payments in Alaska
Selling Wind Royalties and Wind Lease Payments
Wind Royalties and Lease Payments in Kenai Peninsula Borough
Wind Royalties and Lease Payments in Denali Borough
Wind Royalties and Lease Payments in Kodiak Island Borough
Wind Royalties and Lease Payments in Aleutians East Borough
Wind Royalties and Lease Payments in Northwest Arctic Borough
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)