Quick answer
The projects came online between 2002 and 2015.[1] Turbine makers represented in the borough: EWT (2 turbines) and Northern Power Systems (1 turbine).[1]
Three of the 6 turbines in the borough have no recorded capacity in the database, so the megawatt figures count the rest.[1]
| Project | Online | Turbines in the borough | Capacity in the borough (MW) |
|---|---|---|---|
| Kotzebue Wind Project | 2002 | 3 | 1.9 |
| Unnamed project (Northwest Arctic Borough) | 2015 | 3 | Not recorded |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the borough have been in place since 2002.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2015.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Northwest Arctic Borough, Alaska has two operating wind projects with 6 turbines and 1.9 MW of recorded capacity in the borough, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] Three of the 6 turbines in the borough have no recorded capacity in the database, so the megawatt figures count the rest.[1]
The projects are Kotzebue Wind Project (2002, 1.9 MW) and Unnamed project (Northwest Arctic Borough) (2015).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, one came online in the 2000s and one in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Alaska boroughs and census areas with wind projects include Nome Census Area (1.8 MW), Denali Borough (24.6 MW), Anchorage Municipality (17.6 MW), Kenai Peninsula Borough (1.5 MW) and Kodiak Island Borough (9 MW).[1]
Wind Royalties and Lease Payments in Alaska
Selling Wind Royalties and Wind Lease Payments
Wind Royalties and Lease Payments in Nome Census Area
Wind Royalties and Lease Payments in Denali Borough
Wind Royalties and Lease Payments in Anchorage Municipality
Wind Royalties and Lease Payments in Kenai Peninsula Borough
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer