Quick answer
The projects came online between 2012 and 2024.[1] One of these projects also has turbines outside Coconino County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: GE Wind (112 turbines) and Vestas (101 turbines).[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Chevelon Butte Wind Phase I | 2023 | 53 | 221 |
| Chevelon Butte Wind Phase II | 2024 | 48 | 216 |
| Babbitt Ranch Wind | 2024 | 50 | 163 |
| Perrin Ranch | 2012 | 62 | 99.2 |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2012.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2024.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Coconino County, Arizona has four operating wind projects with 213 turbines and 699.2 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]
The projects are Chevelon Butte Wind Phase I (2023, 221 MW), Chevelon Butte Wind Phase II (2024, 216 MW), Babbitt Ranch Wind (2024, 163 MW) and Perrin Ranch (2012, 99.2 MW).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, one came online in the 2010s and three in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Arizona counties with wind projects include Navajo County (146.1 MW), Mohave County (359.6 MW) and Cochise County (30 MW).[1]
Wind Royalties and Lease Payments in Arizona
Selling Wind Royalties and Wind Lease Payments
Wind Royalties and Lease Payments in Navajo County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)