Wind Royalties and Lease Payments in Navajo County, Arizona

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Navajo County, Arizona has four operating wind projects with 178 turbines and 146.1 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Navajo County

The projects came online between 2009 and 2025.[1] One of these projects also has turbines outside Navajo County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: Suzlon (61 turbines) and Vestas (4 turbines).[1]

113 of the 178 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Dry Lake II20103165.1
Dry Lake20093063
Chevelon Butte Wind Phase I2023418
Unnamed project (Navajo County)2025113Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Navajo County

Turbines at the oldest project in the county have been in place since 2009.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2025.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Navajo County, Arizona?

Navajo County, Arizona has four operating wind projects with 178 turbines and 146.1 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] 113 of the 178 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Navajo County?

The projects are Dry Lake II (2010, 65.1 MW), Dry Lake (2009, 63 MW), Chevelon Butte Wind Phase I (2023, 18 MW) and Unnamed project (Navajo County) (2025).[1]

Can I sell wind lease payments or royalties in Navajo County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Navajo County come online?

Of the projects with a recorded year, one came online in the 2000s, one in the 2010s and two in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Arizona counties also have wind projects?

Nearby Arizona counties with wind projects include Coconino County (699.2 MW), Cochise County (30 MW) and Mohave County (359.6 MW).[1]

Related pages

Wind Royalties and Lease Payments in Arizona

Selling Wind Royalties and Wind Lease Payments

Solar Lease Payments and Royalties in Navajo County

Wind Royalties and Lease Payments in Coconino County

Wind Royalties and Lease Payments in Cochise County

Wind Royalties and Lease Payments in Mohave County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer