(817) 778-9532

Wind Royalties and Lease Payments in Kern County, California

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Kern County, California has 45 operating wind projects with 3,249 turbines and 3,253.9 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Kern County

The projects came online between 1982 and 2021.[1] Turbine makers represented in the county: Vestas (666 turbines), GE Wind (535 turbines) and Micon (177 turbines).[1]

1,540 of the 3,249 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Voyager II201854193.5
Manzana Winds2012126189
Pinyon Pines I201259177
Alta VIII (partial)201158174
Alta V201156168
North Sky River2012100162
Alta I2010101151.5
Alta III201150150
Pacific Wind201270143.5
Alta VI (partial)201146138
Alta X201348136.8
Voyager Wind201938131.1
Alta II201041123
Pine Tree Wind Farm200980120
Windstar201260120
Alta IV201137111
Pinyon Pines II201237111
Rising Tree North20143099
Rising Tree South20153099
Alta XI20134991.4
Brookfield Tehachapi 1 (CCDLP)20122678
Sky River Repower20212158.7
Point Wind Plant20211657.6
Oasis Repowering20201655.2
Wind Wall20211344.9

20 smaller projects are not listed.

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Kern County

Turbines at the oldest project in the county have been in place since 1982.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2021.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Kern County, California?

Kern County, California has 45 operating wind projects with 3,249 turbines and 3,253.9 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] 1,540 of the 3,249 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Kern County?

The largest projects are Voyager II (2018, 193.5 MW), Manzana Winds (2012, 189 MW), Pinyon Pines I (2012, 177 MW), Alta VIII (partial) (2011, 174 MW), Alta V (2011, 168 MW), North Sky River (2012, 162 MW) and Alta I (2010, 151.5 MW).[1] The next are Alta III (2011, 150 MW), plus 17 more in the table above and 20 smaller ones the table does not list.[1]

Can I sell wind lease payments or royalties in Kern County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Kern County come online?

Of the projects with a recorded year, nine came online in the 1980s, three in the 1990s, five in the 2000s, 23 in the 2010s and four in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby California counties also have wind projects?

Nearby California counties with wind projects include Los Angeles County (1.9 MW), San Bernardino County (8.7 MW), Riverside County (666.8 MW), Santa Barbara County (95.3 MW) and San Diego County (183 MW).[1]

Related pages

Wind Royalties and Lease Payments in California

Selling Wind Royalties and Wind Lease Payments

Oil and gas mineral rights in Kern County, California

Mineral rights in California

Solar Lease Payments and Royalties in Kern County

Wind Royalties and Lease Payments in Los Angeles County

Wind Royalties and Lease Payments in San Bernardino County

Wind Royalties and Lease Payments in Riverside County

Wind Royalties and Lease Payments in Santa Barbara County

Wind Royalties and Lease Payments in San Diego County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer