Wind Royalties and Lease Payments in Riverside County, California

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Riverside County, California has 26 operating wind projects with 624 turbines and 666.8 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Riverside County

The projects came online between 1984 and 2025.[1] Turbine makers represented in the county: Vestas (201 turbines), Mitsubishi (110 turbines) and GE Wind (85 turbines).[1]

10 of the 624 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Cabazon199910976.4
Mountain View Power Partners Repower20221666.7
Whitewater Hill20024161.5
Coachella Hills20211657.2
Palm Springs (repower)20113349.5
Mountain View IV20124949
Dillon20084545
San Gorgonio Westwinds II LLC19996243.4
San Gorgonio Farms Wind Farm198411431.4
Alta Mesa2025728
Mesa Wind Repowering2024728
Painted Hills Repower2020927
Mountain View Power Partners III20033422.4
Edom Hills (repower)2008820
Karen Avenue Windfarm20031211.7
Unnamed project (Riverside County)2020911.2
Mountain View Power Partners I & II2001169.6
Garnet Wind Project2009136.5
Wagner201226
East Winds198574.2
Robertsons Ready Mix201223.2
Nestle Waters201223
Cabazon-Shell200232
San Gorgonio Wind Associates 7198622
Nestle Waters II201811.9

1 smaller projects are not listed.

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Riverside County

Turbines at the oldest project in the county have been in place since 1984.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2025.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Riverside County, California?

Riverside County, California has 26 operating wind projects with 624 turbines and 666.8 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] 10 of the 624 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Riverside County?

The largest projects are Cabazon (1999, 76.4 MW), Mountain View Power Partners Repower (2022, 66.7 MW), Whitewater Hill (2002, 61.5 MW), Coachella Hills (2021, 57.2 MW) and Palm Springs (repower) (2011, 49.5 MW).[1] The next are Mountain View IV (2012, 49 MW), Dillon (2008, 45 MW) and San Gorgonio Westwinds II LLC (1999, 43.4 MW), plus 17 more in the table above and one smaller ones the table does not list.[1]

Can I sell wind lease payments or royalties in Riverside County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Riverside County come online?

Of the projects with a recorded year, four came online in the 1980s, two in the 1990s, eight in the 2000s, six in the 2010s and six in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby California counties also have wind projects?

Nearby California counties with wind projects include San Bernardino County (8.7 MW), San Diego County (183 MW), Imperial County (264.2 MW), Los Angeles County (1.9 MW) and Kern County (3,253.9 MW).[1]

Related pages

Wind Royalties and Lease Payments in California

Selling Wind Royalties and Wind Lease Payments

Oil and gas mineral rights in Riverside County, California

Mineral rights in California

Solar Lease Payments and Royalties in Riverside County

Wind Royalties and Lease Payments in San Bernardino County

Wind Royalties and Lease Payments in San Diego County

Wind Royalties and Lease Payments in Imperial County

Wind Royalties and Lease Payments in Los Angeles County

Wind Royalties and Lease Payments in Kern County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)