Buckhead Energy buys wind lease payments and wind royalties. Whiteside County, Illinois has one operating wind project with 4 turbines and 10.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Whiteside County

The project came online in 2019.[1] The project also has turbines outside Whiteside County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: Siemens Gamesa Renewable Energy (4 turbines).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Green River2019410.5

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Whiteside County

Turbines at the project in the county have been in place since 2019.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

Wind leases in Illinois

The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.[3]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Whiteside County, Illinois?

Whiteside County, Illinois has one operating wind project with 4 turbines and 10.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Whiteside County?

The project is Green River (2019, 10.5 MW).[1]

Can I sell wind lease payments or royalties in Whiteside County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Whiteside County come online?

The project came online in 2019.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Illinois counties also have wind projects?

Nearby Illinois counties with wind projects include Bureau County (503.2 MW), Lee County (682.9 MW), Stark County (60 MW), Henry County (533 MW) and Marshall County (183.1 MW).[1]

Related pages

Wind Royalties and Lease Payments in Illinois

Selling Wind Royalties and Wind Lease Payments

Mineral rights in Illinois

Solar Lease Payments and Royalties in Whiteside County

Wind Royalties and Lease Payments in Bureau County

Wind Royalties and Lease Payments in Lee County

Wind Royalties and Lease Payments in Stark County

Wind Royalties and Lease Payments in Henry County

Wind Royalties and Lease Payments in Marshall County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

[3] Wind explained: Where wind power is harnessed — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer