(817) 778-9532

Wind Royalties and Lease Payments in Randolph County, Indiana

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Randolph County, Indiana has six operating wind projects with 166 turbines and 412.3 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Randolph County

The projects came online between 2010 and 2021.[1] One of these projects also has turbines outside Randolph County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: Vestas (144 turbines), GE Wind (15 turbines) and Nordic (2 turbines).[1]

Five of the 166 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Headwaters2014100200
Headwaters II202144178.8
Bluff Point20171531.5
Randolph Eastern School Corporation201011
The City of Union City201011
Unnamed project (Randolph County)Not recorded5Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Randolph County

Turbines at the oldest project in the county have been in place since 2010.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2021.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Randolph County, Indiana?

Randolph County, Indiana has six operating wind projects with 166 turbines and 412.3 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] Five of the 166 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Randolph County?

The projects are Headwaters (2014, 200 MW), Headwaters II (2021, 178.8 MW), Bluff Point (2017, 31.5 MW), Randolph Eastern School Corporation (2010, 1 MW), The City of Union City (2010, 1 MW) and Unnamed project (Randolph County) (details not recorded).[1]

Can I sell wind lease payments or royalties in Randolph County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Randolph County come online?

Of the projects with a recorded year, four came online in the 2010s and one in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Indiana counties also have wind projects?

Nearby Indiana counties with wind projects include Jay County (232.7 MW), Madison County (89.6 MW), Tipton County (110.4 MW), White County (1,202.7 MW) and Benton County (1,249.3 MW).[1]

Related pages

Wind Royalties and Lease Payments in Indiana

Selling Wind Royalties and Wind Lease Payments

Mineral rights in Indiana

Solar Lease Payments and Royalties in Randolph County

Wind Royalties and Lease Payments in Jay County

Wind Royalties and Lease Payments in Madison County

Wind Royalties and Lease Payments in Tipton County

Wind Royalties and Lease Payments in White County

Wind Royalties and Lease Payments in Benton County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer