(817) 778-9532

Wind Royalties and Lease Payments in Boone County, Iowa

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Boone County, Iowa has four operating wind projects with 77 turbines and 186.2 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Boone County

The projects came online between 2017 and 2023.[1] Three of these projects also have turbines outside Boone County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: Vestas (44 turbines), GE Wind (28 turbines) and Nordex (1 turbine).[1]

Four of the 77 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Great Pathfinder Wind20232895.2
Beaver Creek20174488
30 MW Iowa DG Portfolio201713
Unnamed project (Boone County)20224Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Boone County

Turbines at the oldest project in the county have been in place since 2017.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2023.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

Wind leases in Iowa

The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.[3]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Boone County, Iowa?

Boone County, Iowa has four operating wind projects with 77 turbines and 186.2 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] Four of the 77 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Boone County?

The projects are Great Pathfinder Wind (2023, 95.2 MW), Beaver Creek (2017, 88 MW), 30 MW Iowa DG Portfolio (2017, 3 MW) and Unnamed project (Boone County) (2022).[1]

Can I sell wind lease payments or royalties in Boone County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Boone County come online?

Of the projects with a recorded year, two came online in the 2010s and two in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Iowa counties also have wind projects?

Nearby Iowa counties with wind projects include Greene County (324.7 MW), Webster County (331.7 MW), Dallas County (6 MW), Hamilton County (245.3 MW) and Hardin County (118.5 MW).[1]

Related pages

Wind Royalties and Lease Payments in Iowa

Selling Wind Royalties and Wind Lease Payments

Wind Royalties and Lease Payments in Greene County

Wind Royalties and Lease Payments in Webster County

Wind Royalties and Lease Payments in Dallas County

Wind Royalties and Lease Payments in Hamilton County

Wind Royalties and Lease Payments in Hardin County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

[3] Wind explained: Where wind power is harnessed — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer