Buckhead Energy buys wind lease payments and wind royalties. Gratiot County, Michigan has nine operating wind projects with 417 turbines and 928.4 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Gratiot County

The projects came online between 2011 and 2023.[1] One of these projects also has turbines outside Gratiot County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: GE Wind (285 turbines), GE Vernova (74 turbines) and Nordex (55 turbines).[1]

Three of the 417 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Heartland Farms Wind202372200.4
Polaris202068168.6
Gratiot Farms202057142.3
Gratiot County201272115.2
Gratiot20116197.6
Beebe Community Wind20123481.6
Pine River20192972.3
Beebe 1B20142150.4
Unnamed project (Gratiot County)20203Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Gratiot County

Turbines at the oldest project in the county have been in place since 2011.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2023.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Gratiot County, Michigan?

Gratiot County, Michigan has nine operating wind projects with 417 turbines and 928.4 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] Three of the 417 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Gratiot County?

The projects are Heartland Farms Wind (2023, 200.4 MW), Polaris (2020, 168.6 MW), Gratiot Farms (2020, 142.3 MW), Gratiot County (2012, 115.2 MW), Gratiot (2011, 97.6 MW), Beebe Community Wind (2012, 81.6 MW), Pine River (2019, 72.3 MW) and Beebe 1B (2014, 50.4 MW), plus one more in the table above.[1]

Can I sell wind lease payments or royalties in Gratiot County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Gratiot County come online?

Of the projects with a recorded year, five came online in the 2010s and four in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Michigan counties also have wind projects?

Nearby Michigan counties with wind projects include Midland County (148.5 MW), Saginaw County (84.8 MW), Isabella County (472.5 MW), Tuscola County (568.5 MW) and Osceola County (10.5 MW).[1]

Related pages

Wind Royalties and Lease Payments in Michigan

Selling Wind Royalties and Wind Lease Payments

Oil and gas mineral rights in Gratiot County, Michigan

Mineral rights in Michigan

Solar Lease Payments and Royalties in Gratiot County

Wind Royalties and Lease Payments in Midland County

Wind Royalties and Lease Payments in Saginaw County

Wind Royalties and Lease Payments in Isabella County

Wind Royalties and Lease Payments in Tuscola County

Wind Royalties and Lease Payments in Osceola County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)