Wind Royalties and Lease Payments in Dodge County, Minnesota

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Dodge County, Minnesota has two operating wind projects with 53 turbines and 66.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Dodge County

The projects came online between 2003 and 2015.[1] Every project here also has turbines outside Dodge County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: NEG Micon (41 turbines) and Vestas (12 turbines).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
McNeilus20034142.5
Pleasant Valley20151224

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Dodge County

Turbines at the oldest project in the county have been in place since 2003.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2015.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Dodge County, Minnesota?

Dodge County, Minnesota has two operating wind projects with 53 turbines and 66.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Dodge County?

The projects are McNeilus (2003, 42.5 MW) and Pleasant Valley (2015, 24 MW).[1]

Can I sell wind lease payments or royalties in Dodge County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Dodge County come online?

Of the projects with a recorded year, one came online in the 2000s and one in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Minnesota counties also have wind projects?

Nearby Minnesota counties with wind projects include Steele County (43.2 MW), Mower County (608 MW), Freeborn County (256.6 MW), Rice County (5 MW) and Winona County (5.8 MW).[1]

Related pages

Wind Royalties and Lease Payments in Minnesota

Selling Wind Royalties and Wind Lease Payments

Solar Lease Payments and Royalties in Dodge County

Wind Royalties and Lease Payments in Steele County

Wind Royalties and Lease Payments in Mower County

Wind Royalties and Lease Payments in Freeborn County

Wind Royalties and Lease Payments in Rice County

Wind Royalties and Lease Payments in Winona County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer