Quick answer
Lincoln County, Mower County and Jackson County have the most recorded wind capacity in Minnesota, with 1,018.9 MW, 608 MW and 601.8 MW.[1]
Wind projects in Minnesota came online between 1998 and 2023.[1]
| County | Projects | Turbines | Capacity (MW) | Online |
|---|---|---|---|---|
| Lincoln County | 15 | 641 | 1,018.9 | 1998–2022 |
| Mower County | 7 | 341 | 608 | 2003–2015 |
| Jackson County | 10 | 348 | 601.8 | 2004–2016 |
| Nobles County | 9 | 255 | 539.3 | 2001–2023 |
| Murray County | 10 | 226 | 402.9 | 2003–2023 |
| Rock County | 4 | 165 | 319.4 | 2002–2022 |
| Pipestone County | 16 | 157 | 302.1 | 2001–2019 |
| Freeborn County | 3 | 147 | 256.6 | 2011–2021 |
| Cottonwood County | 5 | 91 | 182.2 | 2006–2016 |
| Martin County | 5 | 62 | 112.1 | 2004–2010 |
| Stearns County | 1 | 39 | 78 | 2016 |
| Dodge County | 2 | 53 | 66.5 | 2003–2015 |
| Clay County | 3 | 35 | 48.5 | 1999–2014 |
| Chippewa County | 1 | 18 | 44.6 | 2018 |
| Steele County | 1 | 24 | 43.2 | 2011 |
| Faribault County | 3 | 22 | 42.7 | 2006–2012 |
| Meeker County | 2 | 24 | 40 | 2011 |
| St. Louis County | 1 | 10 | 25 | 2008 |
| Grant County | 1 | 10 | 20 | 2010 |
| Lyon County | 1 | 9 | 18.9 | 2008 |
| Watonwan County | 2 | 6 | 10 | 2008–2013 |
| Winona County | 2 | 3 | 5.8 | 2011 |
| Rice County | 2 | 3 | 5 | 2006–2011 |
| Red Lake County | 1 | 2 | 4.6 | 2020 |
| Kandiyohi County | 1 | 2 | 4 | 2009 |
| Redwood County | 1 | 2 | 3.3 | 2005 |
| Stevens County | 1 | 2 | 3.3 | 2011 |
| Becker County | 1 | 2 | 3 | 2014 |
| Dakota County | 1 | 1 | 2.5 | 2011 |
| Todd County | 1 | 1 | 2.5 | 2007 |
| Otter Tail County | 1 | 1 | 2.3 | 2018 |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] In a flat or fixed-fee arrangement, the developer pays a fixed fee per turbine, per unit of land or per megawatt of installed capacity on a monthly or yearly basis.[2] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Minnesota has 102 operating wind projects with 2,702 turbines and 4,817 MW of recorded capacity across 31 counties, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]
By recorded capacity, the leading counties are Lincoln County (1,018.9 MW), Mower County (608 MW), Jackson County (601.8 MW), Nobles County (539.3 MW) and Murray County (402.9 MW).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, four came online in the 1990s, 52 in the 2000s, 33 in the 2010s and 12 in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer