Wind Royalties and Lease Payments in North Dakota

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. North Dakota has 49 operating wind projects with 2,330 turbines and 4,940.5 MW of recorded capacity across 26 counties, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects by county in North Dakota

Oliver County, Morton County and Williams County have the most recorded wind capacity in North Dakota, with 590.8 MW, 484.5 MW and 448.8 MW.[1]

Wind projects in North Dakota came online between 2003 and 2025.[1]

CountyProjectsTurbinesCapacity (MW)Online
Oliver County10220590.82006–2024
Morton County7198484.52010–2019
Williams County2146448.82017–2021
McIntosh County21142642020–2025
Barnes County2170258.92008–2010
Dickey County4144253.52008–2020
Bowman County287228.22010–2025
Cavalier County3133210.62007–2008
Burleigh County3130204.22005–2010
Stutsman County11002002016
Burke County174193.22020
Emmons County183175.82019
Logan County266172.32019–2025
Stark County297169.72016
Adams County259155.52015–2018
Rolette County1751502015
Pierce County171149.12009
Hettinger County1721492016
Steele County2821232009
Ward County2801202009
McHenry County246111.32006–2018
LaMoure County24161.52003
Griggs County23346.52009–2011
Mercer County1717.52019
Ramsey County111.62013
Pembina County1112012

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

How wind leases pay

In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] In a flat or fixed-fee arrangement, the developer pays a fixed fee per turbine, per unit of land or per megawatt of installed capacity on a monthly or yearly basis.[2] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Wind leases in North Dakota

North Dakota: apart from wind easements, an interest in the wind resource may not be severed from the surface estate, but a seller of real estate may keep payments from an existing wind energy project.[3]

North Dakota: a wind option, wind easement or wind lease is void after five years unless any required certificate of site compatibility or conditional use permit has issued and a transmission interconnection request is in process and not under suspension.[3]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in North Dakota?

North Dakota has 49 operating wind projects with 2,330 turbines and 4,940.5 MW of recorded capacity across 26 counties, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which North Dakota counties have the most wind capacity?

By recorded capacity, the leading counties are Oliver County (590.8 MW), Morton County (484.5 MW), Williams County (448.8 MW), McIntosh County (264 MW) and Barnes County (258.9 MW).[1]

Can I sell wind lease payments or royalties in North Dakota?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When were North Dakota's wind projects built?

Of the projects with a recorded year, 17 came online in the 2000s, 26 in the 2010s and six in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

What does North Dakota law say about wind leases?

North Dakota: apart from wind easements, an interest in the wind resource may not be severed from the surface estate, but a seller of real estate may keep payments from an existing wind energy project.[3] North Dakota: a wind option, wind easement or wind lease is void after five years unless any required certificate of site compatibility or conditional use permit has issued and a transmission interconnection request is in process and not under suspension.[3]

Related pages

Selling Wind Royalties and Wind Lease Payments

Mineral rights in North Dakota

Coal Mineral Rights and Royalties in North Dakota

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

[3] North Dakota Century Code, Chapter 17-04: Wind Energy Property Rights — North Dakota Legislative Branch (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer