(817) 778-9532

Wind Royalties and Lease Payments in Emmons County, North Dakota

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Emmons County, North Dakota has one operating wind project with 83 turbines and 175.8 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Emmons County

The project came online in 2019.[1] The project also has turbines outside Emmons County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: GE Wind (83 turbines).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Emmons-Logan201983175.8

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Emmons County

Turbines at the project in the county have been in place since 2019.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

Wind leases in North Dakota

North Dakota: apart from wind easements, an interest in the wind resource may not be severed from the surface estate, but a seller of real estate may keep payments from an existing wind energy project.[3]

North Dakota: a wind option, wind easement or wind lease is void after five years unless any required certificate of site compatibility or conditional use permit has issued and a transmission interconnection request is in process and not under suspension.[3]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Emmons County, North Dakota?

Emmons County, North Dakota has one operating wind project with 83 turbines and 175.8 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Emmons County?

The project is Emmons-Logan (2019, 175.8 MW).[1]

Can I sell wind lease payments or royalties in Emmons County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Emmons County come online?

The project came online in 2019.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby North Dakota counties also have wind projects?

Nearby North Dakota counties with wind projects include Logan County (172.3 MW), McIntosh County (264 MW), LaMoure County (61.5 MW), Dickey County (253.5 MW) and Burleigh County (204.2 MW).[1]

What does North Dakota law say about wind leases?

North Dakota: apart from wind easements, an interest in the wind resource may not be severed from the surface estate, but a seller of real estate may keep payments from an existing wind energy project.[3] North Dakota: a wind option, wind easement or wind lease is void after five years unless any required certificate of site compatibility or conditional use permit has issued and a transmission interconnection request is in process and not under suspension.[3]

Related pages

Wind Royalties and Lease Payments in North Dakota

Selling Wind Royalties and Wind Lease Payments

Oil and gas mineral rights in Emmons County, North Dakota

Mineral rights in North Dakota

Wind Royalties and Lease Payments in Logan County

Wind Royalties and Lease Payments in McIntosh County

Wind Royalties and Lease Payments in LaMoure County

Wind Royalties and Lease Payments in Dickey County

Wind Royalties and Lease Payments in Burleigh County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

[3] North Dakota Century Code, Chapter 17-04: Wind Energy Property Rights — North Dakota Legislative Branch (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer