The projects came online between 2011 and 2017.[1] Turbine makers represented in the county: GE Wind (25 turbines) and Nordtank (6 turbines).[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Benson Creek | 2017 | 5 | 10 |
| Durbin Creek | 2017 | 5 | 10 |
| Jett Creek | 2017 | 5 | 10 |
| Prospector | 2017 | 5 | 10 |
| Willow Spring | 2017 | 5 | 10 |
| Lime Wind | 2011 | 6 | 3 |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2011.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2017.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Baker County, Oregon has six operating wind projects with 31 turbines and 53 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]
The projects are Benson Creek (2017, 10 MW), Durbin Creek (2017, 10 MW), Jett Creek (2017, 10 MW), Prospector (2017, 10 MW), Willow Spring (2017, 10 MW) and Lime Wind (2011, 3 MW).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, six came online in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Oregon counties with wind projects include Union County (100.7 MW), Umatilla County (402.8 MW), Morrow County (872.3 MW), Gilliam County (1,612.3 MW) and Sherman County (1,258.4 MW).[1]
Wind Royalties and Lease Payments in Oregon
Selling Wind Royalties and Wind Lease Payments
Wind Royalties and Lease Payments in Union County
Wind Royalties and Lease Payments in Umatilla County
Wind Royalties and Lease Payments in Morrow County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer