(817) 778-9532

Wind Royalties and Lease Payments in Sherman County, Oregon

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Sherman County, Oregon has 12 operating wind projects with 611 turbines and 1,258.4 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Sherman County

The projects came online between 2001 and 2022.[1] Turbine makers represented in the county: GE Wind (214 turbines), Siemens (185 turbines) and Vestas (116 turbines).[1]

One of the 611 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Klondike III2007124221.2
Golden Hills (Oregon)202250197
Biglow Canyon III201076174.8
Biglow Canyon II200965149.5
Biglow Canyon I200776125.4
Hay Canyon200948100.8
Star Point20104798.7
Klondike II20055080
Klondike IIIA20085278
Klondike I20011624
PaTu Wind Farm201069
Gold Hills Wind20211Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Sherman County

Turbines at the oldest project in the county have been in place since 2001.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2022.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Sherman County, Oregon?

Sherman County, Oregon has 12 operating wind projects with 611 turbines and 1,258.4 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] One of the 611 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Sherman County?

The projects are Klondike III (2007, 221.2 MW), Golden Hills (Oregon) (2022, 197 MW), Biglow Canyon III (2010, 174.8 MW), Biglow Canyon II (2009, 149.5 MW), Biglow Canyon I (2007, 125.4 MW), Hay Canyon (2009, 100.8 MW), Star Point (2010, 98.7 MW) and Klondike II (2005, 80 MW), plus four more in the table above.[1]

Can I sell wind lease payments or royalties in Sherman County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Sherman County come online?

Of the projects with a recorded year, seven came online in the 2000s, three in the 2010s and two in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Oregon counties also have wind projects?

Nearby Oregon counties with wind projects include Gilliam County (1,612.3 MW), Morrow County (872.3 MW), Umatilla County (402.8 MW), Union County (100.7 MW) and Baker County (53 MW).[1]

Related pages

Wind Royalties and Lease Payments in Oregon

Selling Wind Royalties and Wind Lease Payments

Wind Royalties and Lease Payments in Gilliam County

Wind Royalties and Lease Payments in Morrow County

Wind Royalties and Lease Payments in Umatilla County

Wind Royalties and Lease Payments in Union County

Wind Royalties and Lease Payments in Baker County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer