(817) 778-9532

Wind Royalties and Lease Payments in Kent County, Rhode Island

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Kent County, Rhode Island has six operating wind projects with 10 turbines and 15 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Kent County

The projects came online between 2016 and 2017.[1] Turbine makers represented in the county: Vensys (10 turbines).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
WED Coventry 2201634.5
WED Coventry 6201634.5
WED Coventry 1201611.5
WED Coventry 3201611.5
WED Coventry 4201611.5
WED Coventry 5201711.5

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Kent County

Turbines at the oldest project in the county have been in place since 2016.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2017.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Kent County, Rhode Island?

Kent County, Rhode Island has six operating wind projects with 10 turbines and 15 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Kent County?

The projects are WED Coventry 2 (2016, 4.5 MW), WED Coventry 6 (2016, 4.5 MW), WED Coventry 1 (2016, 1.5 MW), WED Coventry 3 (2016, 1.5 MW), WED Coventry 4 (2016, 1.5 MW) and WED Coventry 5 (2017, 1.5 MW).[1]

Can I sell wind lease payments or royalties in Kent County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Kent County come online?

Of the projects with a recorded year, six came online in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Rhode Island counties also have wind projects?

Nearby Rhode Island counties with wind projects include Washington County (1.5 MW), Providence County (30 MW) and Newport County (1.5 MW).[1]

Related pages

Wind Royalties and Lease Payments in Rhode Island

Selling Wind Royalties and Wind Lease Payments

Solar Lease Payments and Royalties in Kent County

Wind Royalties and Lease Payments in Washington County

Wind Royalties and Lease Payments in Providence County

Wind Royalties and Lease Payments in Newport County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer