The projects came online between 2012 and 2021.[1] Turbine makers represented in the county: Vensys (10 turbines) and Goldwind (3 turbines).[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Field's Point Wastewater Treatment Facility | 2012 | 3 | 4.5 |
| Green Providence Wind II | 2021 | 2 | 3 |
| WED Green Hill | 2018 | 1 | 3 |
| WED Plainfield | 2018 | 1 | 3 |
| WED Plainfield II | 2018 | 1 | 3 |
| WED Plainfield III | 2018 | 1 | 3 |
| WED Shun I | 2018 | 1 | 3 |
| WED Shun II | 2018 | 1 | 3 |
| WED Shun III | 2018 | 1 | 3 |
| Green Providence Wind I | 2021 | 1 | 1.5 |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2012.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2021.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Providence County, Rhode Island has 10 operating wind projects with 13 turbines and 30 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]
The largest projects are Field's Point Wastewater Treatment Facility (2012, 4.5 MW), Green Providence Wind II (2021, 3 MW), WED Green Hill (2018, 3 MW), WED Plainfield (2018, 3 MW), WED Plainfield II (2018, 3 MW), WED Plainfield III (2018, 3 MW) and WED Shun I (2018, 3 MW).[1] The next are WED Shun II (2018, 3 MW), plus two more in the table above.[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, eight came online in the 2010s and two in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Rhode Island counties with wind projects include Washington County (1.5 MW), Kent County (15 MW) and Newport County (1.5 MW).[1]
Wind Royalties and Lease Payments in Rhode Island
Selling Wind Royalties and Wind Lease Payments
Solar Lease Payments and Royalties in Providence County
Wind Royalties and Lease Payments in Washington County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer