(817) 778-9532

Wyoming Oil & Gas Activity Snapshot

Twelve-month drilling permits, spuds and first production, the DUC-proxy backlog, permit-to-spud cycle times and Wyoming counties ranked by activity momentum. Each figure is a count, percentile or index Buckhead Energy computes from grouped records; no individual well is listed.

Last computed: 2026-11-01

Quick answer: Over the last 12 months Wyoming recorded at least 673 drilling permits, 322 spuds and 204 wells reaching first production, by Buckhead Energy’s count; 569 wells sit in the DUC proxy with a median of 341 days since spud. Converse County ranks first by activity momentum score (163). Monthly counts under 3 are withheld, so totals are floors.

Frequently Asked Questions

How much drilling activity is there in Wyoming?

In the last 12 complete months: at least 673 drilling permits, 322 spuds and 204 wells reaching first production. Each total adds published monthly counts, so it is a floor.

How many Wyoming wells are drilled but not producing?

569 wells were spudded in the last three years with no first production reported yet. This DUC proxy includes dry holes, injection wells and reporting lag, so it is not a completion queue.

How long do Wyoming wells take from permit to spud?

The median permit 6 to 36 months old reached spud in 67 days, and the median spud 12 to 36 months old reached first production in 168 days.

What is the activity momentum score?

It multiplies the change in a county’s permits by the change in its oil and gas production, comparing the last 12 months with the 12 before, and scales the result so 100 means both held level. It describes activity trends, not value.

Permits, last 12 months
673
Spuds, last 12 months
322
First production, last 12 months
204
Wells in the DUC proxy
569
DUC-proxy median age
341 days
DUC backlog change
-9.9%
Median permit to spud
67 days
Median spud to first production
168 days

Wyoming counties by activity momentum (top 10)

Ranked by momentum score: the change in drilling permits times the change in county oil and gas production, last 12 months against the 12 before. 100 means both held level. Counties without enough published data in both windows are not scored.

CountyMomentumPermits changeProduction change
Converse163+65%-1%

Wyoming cycle times (percentiles, days)

Permit to spud uses permits 6–36 months old; spud to first production uses spuds 12–36 months old. Percentiles resting on fewer than 5 wells show n<5.

StageWells25th pctMedian75th pct
Permit to spud7552567148
Spud to first production504115168255

Top 10 Wyoming operators by wells operated

Ranked by wells operated on record, not production or value. See the full leaderboard.

OperatorWells operatedTop formation
EOG Resources 13,431 Niobrara- Mowry
Anadarko Petroleum 7,252 Niobrara- Mowry
Devon Energy Production Company 6,180 Niobrara- Mowry
Anschutz Exploration 6,175 Powder River Basin
Lance Oil & Gas Company 4,038 Niobrara- Mowry
Carbon Creek Energy 3,828 Powder River Basin
Purewest Resources Inc. 3,797 Mesaverde-Lance
Pennaco Energy Incorporated 3,713 Powder River Basin
Wold Energy Partners 3,680 Niobrara- Mowry
Crowheart Energy 3,634 Mesaverde-Lance-Lewis

Top 10 Wyoming counties by wells on record

Ranked by total wells on record in the county summary.

CountyWells on record
Campbell60,611
Converse27,165
Johnson24,009
Sweetwater14,101
Sublette12,666
Natrona10,330
Laramie9,858
Sheridan8,382
Weston7,723
Carbon5,803

Top 10 Wyoming formations and plays by wells on record

Formation or playWells on recordOperators
Niobrara- Mowry 76,491 1,575
Mesaverde-Lance-Lewis 12,094 346
Muddy J Sand 10,091 233
Mesaverde-Lance 9,538 207
Powder River Basin 9,050 1,346
Hilliardbaxtermancos-Niobrara 7,062 418
Big Horn Basin 6,695 835
Green River Basin 4,009 582
Cretaceous-Lower Tertiary 3,680 461
Bighorn Basin 3,330 701

How these figures are computed

Buckhead Energy computes every figure on this page from grouped records in public oil and gas data. The page shows counts, sums, percentiles and indexes only; it does not list individual wells, leases or permits.

Counts under 3 wells and percentiles under 5 wells are withheld; totals are floors.

12-month totals add only the monthly figures that were published, so they are floors, not exact counts.

DUC here is a proxy: a well spudded in the last three years with no first production reported yet. It includes dry holes, injection wells and reporting lag, and does not establish completion status.

Cycle-time cohorts: permit-to-spud uses permits 6–36 months old; spud-to-first-production uses spuds 12–36 months old.

Momentum = 100 × (permits, last 12 months ÷ prior 12 months) × (county oil-and-gas production, last 12 months ÷ prior 12 months). 100 means both held level.

Last computed: 2026-11-01. These figures are informational only and are not a valuation of any mineral or royalty interest.

Own Wyoming Mineral Rights?

Statewide activity does not establish anything about a specific tract. Compare these figures with your own lease and statements when considering your mineral rights.

Get Your Free Written Offer