Quick answer
The plants came online between 2011 and 2025.[1] 30 of the 36 plants with a recorded mounting type use tracking systems that follow the sun, and six use fixed-tilt panels.[1] Four plants have battery storage on site.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| Aquamarine | 2021 | 250 | Tracking |
| Solar Blue | 2023 | 250 | Fixed tilt |
| Chestnut | 2023 | 150.6 | Not recorded |
| Mustang Two | 2020 | 150 | Tracking |
| American Kings Solar, LLC | 2020 | 128 | Tracking |
| Henrietta Solar Project | 2016 | 102 | Tracking |
| RE Mustang, LLC | 2016 | 100 | Tracking |
| Slate Hybrid | 2021 | 50.5 | Tracking |
| Corcoran Solar 3 | 2016 | 21.2 | Tracking |
| Corcoran Solar | 2013 | 20 | Tracking |
| Guernsey Solar Station | 2013 | 20 | Tracking |
| Kettleman Solar-Centaurus | 2015 | 20 | Tracking |
| RE Kansas Solar, LLC | 2014 | 20 | Tracking |
| RE Kansas South, LLC | 2013 | 20 | Tracking |
| Sun City Project, LLC | 2011 | 20 | Fixed tilt |
| Almond | 2021 | 19.9 | Tracking |
| CID Solar, LLC | 2014 | 19.8 | Tracking |
| Corcoran Solar 2 | 2015 | 19.8 | Tracking |
| RE Kent South, LLC | 2014 | 19.4 | Tracking |
| Sand Drag, LLC | 2011 | 19 | Fixed tilt |
| CED Avenal | 2017 | 15.8 | Tracking |
| Java Solar, LLC | 2022 | 13.5 | Tracking |
| Cottonwood Solar, LLC (City of Corcoran) | 2015 | 12 | Tracking |
| Lemoore West | 2022 | 7.9 | Fixed tilt |
| Avenal Park | 2011 | 6 | Fixed tilt |
14 smaller plants are not listed.
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
The oldest utility-scale solar plant in the county came online in 2011.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2025.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
In 2025, Texas accounted for the largest share of total U.S. utility-scale solar electricity generation, followed by California.[5]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Kings County, California has 39 utility-scale solar plants of at least 1 MW, with 1,513.8 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The largest plants are Aquamarine (2021, 250 MW AC), Solar Blue (2023, 250 MW AC), Chestnut (2023, 150.6 MW AC), Mustang Two (2020, 150 MW AC), American Kings Solar, LLC (2020, 128 MW AC) and Henrietta Solar Project (2016, 102 MW AC).[1] The next are RE Mustang, LLC (2016, 100 MW AC) and Slate Hybrid (2021, 50.5 MW AC), plus 17 more in the table above and 14 smaller ones the table does not list.[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, 22 came online in the 2010s and 17 in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby California counties with utility-scale solar plants include Tulare County (934.6 MW AC), Fresno County (1,610.6 MW AC), Madera County (120 MW AC), San Luis Obispo County (853.2 MW AC) and Monterey County (291.6 MW AC).[1]
Solar Lease Payments and Royalties in California
Selling Solar Lease Payments and Solar Royalties
Oil and gas mineral rights in Kings County, California
Solar Lease Payments and Royalties in Tulare County
Solar Lease Payments and Royalties in Fresno County
Solar Lease Payments and Royalties in Madera County
Solar Lease Payments and Royalties in San Luis Obispo County
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)
Buckhead Energy buys solar lease payments and solar royalties.
Get a Free Written Offer