Quick answer
The plants came online between 2009 and 2024.[1] 10 of the 16 plants with a recorded mounting type use tracking systems that follow the sun, and six use fixed-tilt panels.[1] One plant has battery storage on site.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| Borden Solar Farm | 2020 | 50 | Tracking |
| Adera Solar | 2015 | 20 | Fixed tilt |
| KDC Solar Madera LLC | 2023 | 10 | Fixed tilt |
| Avenue 26 Solar | 2024 | 7.6 | Tracking |
| Wonderful Firebaugh | 2022 | 5.4 | Tracking |
| Costa View Farms | 2024 | 5 | Fixed tilt |
| Wonderful Orchards-New Columbia | 2020 | 5 | Fixed tilt |
| Pacific Ethanol Madera Solar Array | 2018 | 3.9 | Tracking |
| Sealed Air Madera Solar Project | 2022 | 3 | Tracking |
| DGS Valley State Prison | 2021 | 2.3 | Tracking |
| DGS Central California Womens Facility | 2020 | 2 | Fixed tilt |
| Madera 1 PV | 2017 | 1.5 | Tracking |
| CA - Madera USD - Madera South HS | 2022 | 1.2 | Tracking |
| Five H Farms Solar Array | 2021 | 1.1 | Fixed tilt |
| City of Madera WWTP | 2009 | 1 | Tracking |
| Madera Community Hospital | 2011 | 1 | Tracking |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
The oldest utility-scale solar plant in the county came online in 2009.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2024.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
In 2025, Texas accounted for the largest share of total U.S. utility-scale solar electricity generation, followed by California.[5]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Madera County, California has 16 utility-scale solar plants of at least 1 MW, with 120 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The largest plants are Borden Solar Farm (2020, 50 MW AC), Adera Solar (2015, 20 MW AC), KDC Solar Madera LLC (2023, 10 MW AC), Avenue 26 Solar (2024, 7.6 MW AC), Wonderful Firebaugh (2022, 5.4 MW AC) and Costa View Farms (2024, 5 MW AC).[1] The next are Wonderful Orchards-New Columbia (2020, 5 MW AC) and Pacific Ethanol Madera Solar Array (2018, 3.9 MW AC), plus eight more in the table above.[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, one came online in the 2000s, four in the 2010s and 11 in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby California counties with utility-scale solar plants include Merced County (352.6 MW AC), Fresno County (1,610.6 MW AC), Kings County (1,513.8 MW AC), Stanislaus County (299.6 MW AC) and San Benito County (148.4 MW AC).[1]
Solar Lease Payments and Royalties in California
Selling Solar Lease Payments and Solar Royalties
Oil and gas mineral rights in Madera County, California
Solar Lease Payments and Royalties in Merced County
Solar Lease Payments and Royalties in Fresno County
Solar Lease Payments and Royalties in Kings County
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)