Quick answer
The plants came online between 2015 and 2025.[1] Nine of the 15 plants with a recorded mounting type use tracking systems that follow the sun, and six use fixed-tilt panels.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| THD Baltimore DCs - 5829 Project Lion | 2021 | 3.8 | Tracking |
| Chaberton Solar Matterhorn | 2025 | 2 | Not recorded |
| Lion One | 2024 | 2 | Tracking |
| Old Court Rd Solar | 2019 | 2 | Fixed tilt |
| White CSG | 2020 | 2 | Tracking |
| MD BALTIMORE 4851 HOLABIRD AVE | 2025 | 1.8 | Not recorded |
| CCBC-Catonsville | 2015 | 1.6 | Fixed tilt |
| THD Baltimore DC - 5830 Project Tiger | 2021 | 1.6 | Fixed tilt |
| CPG - Duke 5300A Holabird | 2022 | 1.5 | Tracking |
| CPG - Duke 5300B Holabird | 2022 | 1.5 | Tracking |
| CPG - Duke 5900 Holabird | 2022 | 1.5 | Tracking |
| CPG - Duke 6000 Holabird | 2022 | 1.5 | Tracking |
| Hollins Ferry CSG | 2021 | 1.5 | Tracking |
| IGS Solar I - BWI2 | 2017 | 1.4 | Fixed tilt |
| Amazon Maryland DCA1 | 2019 | 1.3 | Fixed tilt |
| IGS Solar I - BWI5 | 2016 | 1.1 | Fixed tilt |
| White Marsh Mall | 2015 | 1.1 | Tracking |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
The oldest utility-scale solar plant in the city came online in 2015.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2025.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
City of Baltimore, Maryland has 17 utility-scale solar plants of at least 1 MW, with 29.2 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The largest plants are THD Baltimore DCs - 5829 Project Lion (2021, 3.8 MW AC), Chaberton Solar Matterhorn (2025, 2 MW AC), Lion One (2024, 2 MW AC), Old Court Rd Solar (2019, 2 MW AC), White CSG (2020, 2 MW AC) and MD BALTIMORE 4851 HOLABIRD AVE (2025, 1.8 MW AC).[1] The next are CCBC-Catonsville (2015, 1.6 MW AC) and THD Baltimore DC - 5830 Project Tiger (2021, 1.6 MW AC), plus nine more in the table above.[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, six came online in the 2010s and 11 in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby Maryland counties with utility-scale solar plants include Howard County (35.4 MW AC), Harford County (56.2 MW AC), Montgomery County (21.5 MW AC), Prince George's County (48.9 MW AC) and Queen Anne's County (102.8 MW AC).[1]
Solar Lease Payments and Royalties in Maryland
Selling Solar Lease Payments and Solar Royalties
Solar Lease Payments and Royalties in Howard County
Solar Lease Payments and Royalties in Harford County
Solar Lease Payments and Royalties in Montgomery County
Solar Lease Payments and Royalties in Prince George's County
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)
Buckhead Energy buys solar lease payments and solar royalties.
Get a Free Written Offer