The projects came online between 2007 and 2025.[1] Two of these projects also have turbines outside Cambria County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: Nordex (55 turbines), Gamesa (46 turbines) and Vestas (19 turbines).[1]
27 of the 148 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Highland North | 2012 | 30 | 75 |
| Highland Wind Project | 2009 | 25 | 62.5 |
| Allegheny Ridge | 2007 | 31 | 62 |
| North Allegheny | 2009 | 20 | 40 |
| Patton Wind Farm | 2012 | 15 | 30 |
| Unnamed project (Cambria County) | 2025 | 27 | Not recorded |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2007.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2025.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Cambria County, Pennsylvania has six operating wind projects with 148 turbines and 269.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] 27 of the 148 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]
The projects are Highland North (2012, 75 MW), Highland Wind Project (2009, 62.5 MW), Allegheny Ridge (2007, 62 MW), North Allegheny (2009, 40 MW), Patton Wind Farm (2012, 30 MW) and Unnamed project (Cambria County) (2025).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, three came online in the 2000s, two in the 2010s and one in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Pennsylvania counties with wind projects include Blair County (181.8 MW), Centre County (42 MW), Somerset County (372.5 MW), Fayette County (61 MW) and Potter County (90 MW).[1]
Wind Royalties and Lease Payments in Pennsylvania
Selling Wind Royalties and Wind Lease Payments
Oil and gas mineral rights in Cambria County, Pennsylvania
Mineral rights in Pennsylvania
Solar Lease Payments and Royalties in Cambria County
Coal Mineral Rights and Royalties in Cambria County
Wind Royalties and Lease Payments in Blair County
Wind Royalties and Lease Payments in Centre County
Wind Royalties and Lease Payments in Somerset County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer