(817) 778-9532

Wind Royalties and Lease Payments in Somerset County, Pennsylvania

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Somerset County, Pennsylvania has nine operating wind projects with 216 turbines and 372.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Somerset County

The projects came online between 2001 and 2016.[1] Turbine makers represented in the county: GE Wind (98 turbines), Vestas (68 turbines) and Suzlon (32 turbines).[1]

18 of the 216 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Twin Ridges201268139.4
Stony Creek20093552.5
Ringer Hill20161439.9
Lookout20081837.8
Casselman20072334.5
Meyersdale20032030
Forward20081429.4
Somerset200169
Unnamed project (Somerset County)Not recorded18Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Somerset County

Turbines at the oldest project in the county have been in place since 2001.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2016.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Somerset County, Pennsylvania?

Somerset County, Pennsylvania has nine operating wind projects with 216 turbines and 372.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] 18 of the 216 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Somerset County?

The projects are Twin Ridges (2012, 139.4 MW), Stony Creek (2009, 52.5 MW), Ringer Hill (2016, 39.9 MW), Lookout (2008, 37.8 MW), Casselman (2007, 34.5 MW), Meyersdale (2003, 30 MW), Forward (2008, 29.4 MW) and Somerset (2001, 9 MW), plus one more in the table above.[1]

Can I sell wind lease payments or royalties in Somerset County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Somerset County come online?

Of the projects with a recorded year, six came online in the 2000s and two in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Pennsylvania counties also have wind projects?

Nearby Pennsylvania counties with wind projects include Fayette County (61 MW), Cambria County (269.5 MW), Blair County (181.8 MW), Centre County (42 MW) and Lancaster County (3.2 MW).[1]

Related pages

Wind Royalties and Lease Payments in Pennsylvania

Selling Wind Royalties and Wind Lease Payments

Oil and gas mineral rights in Somerset County, Pennsylvania

Mineral rights in Pennsylvania

Coal Mineral Rights and Royalties in Somerset County

Wind Royalties and Lease Payments in Fayette County

Wind Royalties and Lease Payments in Cambria County

Wind Royalties and Lease Payments in Blair County

Wind Royalties and Lease Payments in Centre County

Wind Royalties and Lease Payments in Lancaster County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer