Quick answer
The projects came online between 2001 and 2021.[1] Turbine makers represented in the county: GE Wind (487 turbines), Siemens (66 turbines) and NEG Micon (33 turbines).[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Peetz Table | 2007 | 267 | 413.8 |
| Niyol Wind | 2021 | 74 | 206.4 |
| Northeast Colorado Wind | 2009 | 81 | 175.7 |
| Colorado Highlands | 2012 | 56 | 91 |
| Spring Canyon Expansion | 2014 | 35 | 62.7 |
| Spring Canyon | 2006 | 40 | 60 |
| Peetz Table Wind Farm | 2001 | 33 | 29.7 |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2001.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2021.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Logan County, Colorado has seven operating wind projects with 586 turbines and 1,039.3 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]
The projects are Peetz Table (2007, 413.8 MW), Niyol Wind (2021, 206.4 MW), Northeast Colorado Wind (2009, 175.7 MW), Colorado Highlands (2012, 91 MW), Spring Canyon Expansion (2014, 62.7 MW), Spring Canyon (2006, 60 MW) and Peetz Table Wind Farm (2001, 29.7 MW).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, four came online in the 2000s, two in the 2010s and one in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Colorado counties with wind projects include Weld County (865.5 MW), Lincoln County (893.8 MW), Kit Carson County (1,010.9 MW), Elbert County (473 MW) and Jefferson County (7.1 MW).[1]
Wind Royalties and Lease Payments in Colorado
Selling Wind Royalties and Wind Lease Payments
Oil and gas mineral rights in Logan County, Colorado
Wind Royalties and Lease Payments in Weld County
Wind Royalties and Lease Payments in Lincoln County
Wind Royalties and Lease Payments in Kit Carson County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)