The projects came online between 2001 and 2019.[1] Four of these projects also have turbines outside Pipestone County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: GE Wind (76 turbines), Siemens (29 turbines) and Suzlon (18 turbines).[1]
One of the 157 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Lake Benton II Repower | 2019 | 44 | 100.2 |
| Stoneray II | 2019 | 25 | 64 |
| Moraine II | 2009 | 20 | 30 |
| Stoneray | 2018 | 10 | 26.3 |
| Farmers' coops/Westridge | 2003 | 18 | 17.1 |
| Tholen & Petersen | 2005 | 8 | 13.2 |
| Moraine Wind Power project | 2003 | 8 | 12 |
| Ridgewind | 2010 | 5 | 11.5 |
| Woodstock Hills Repower | 2018 | 4 | 9.2 |
| West Pipestone (Maiden Winds) | 2004 | 5 | 8.3 |
| Uilk Wind Farm | 2009 | 3 | 4.5 |
| Hilltop Power | 2009 | 1 | 2 |
| Kas Farms | 2001 | 2 | 1.5 |
| Olsen Farms | 2001 | 2 | 1.5 |
| Shane Colwell | 2006 | 1 | 0.8 |
| Unnamed project (Pipestone County) | 2018 | 1 | Not recorded |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2001.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2019.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Pipestone County, Minnesota has 16 operating wind projects with 157 turbines and 302.1 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] One of the 157 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]
The largest projects are Lake Benton II Repower (2019, 100.2 MW), Stoneray II (2019, 64 MW), Moraine II (2009, 30 MW), Stoneray (2018, 26.3 MW), Farmers' coops/Westridge (2003, 17.1 MW), Tholen & Petersen (2005, 13.2 MW) and Moraine Wind Power project (2003, 12 MW).[1] The next are Ridgewind (2010, 11.5 MW), plus eight more in the table above.[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, 10 came online in the 2000s and six in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Minnesota counties with wind projects include Murray County (402.9 MW), Lincoln County (1,018.9 MW), Rock County (319.4 MW), Lyon County (18.9 MW) and Nobles County (539.3 MW).[1]
Wind Royalties and Lease Payments in Minnesota
Selling Wind Royalties and Wind Lease Payments
Wind Royalties and Lease Payments in Murray County
Wind Royalties and Lease Payments in Lincoln County
Wind Royalties and Lease Payments in Rock County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer